Eth-Epics
2306 Bilder
Publication, Switzerland 98, Demolition Hotel Rigi-Kulm
2/1999
Publication, Switzerland 98, Rigi-Kulm
2/1999
Railroad area near Goldau with the Rigi
ca. 1875
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Railroad bridge at Ossingen (over the river Thur): 1: train 7955 at 14:33 from Winterthur, S 29 without lateral sun ; 2: train 7958 at 15:25 to Winterthur, S 29 with lateral sun ; 3: train 7959 at 15:33 from Winterthur, S 29 with lateral sun ; Chräbel in Goldau with Rigi steam loco 17 and BDhe 4/4 15 and driving trailer Bt 25 on downhill at 09:45
25.07.2001-02.08.2001
Rain, Rigi
03.07.1957
Reppischtal ZH, partial view with view towards Lake Zug, Rigi, location, west Albis chain
14.02.1973
Restaurant Bärenstube, Rigi
22.07.1983
Restaurant Bärenstube, Rigi
22.07.1983
Restaurant Michaelskreuz (800 m above sea level), view towards Rigi above Gisikon-Root
vor 26.09.1955
Reuss valley near Unterlunkhofen, Rigi from north 1500 m
30.07.1934
Reuss Valley, Lake Zug, Rigi
26.05.1964
Reuss valley, Lake Zug, Rigi, Central Alps from N. 1000 m
1925
Reuss, Reuss Valley, Rigi, Pilatus
8/1986
Rickenbach, Rigi, Pilatus
20.11.1964
Righi [Rigi]
ca. 1875
Righi [Rigi] Line and Pilatus
vor 26.06.1929
Rigi
24.06.2001
Rigi
29.08.1992
Rigi
05.07.1956
Rigi
12.09.1977
Rigi
ca. 1880
Rigi
29.08.1992
Rigi
29.08.1992
Rigi
12/1936
Rigi
01.02.1905
Rigi
09.01.1944
Rigi
22.07.1983
Rigi
21.10.1951
Rigi
22.07.2001
Rigi
ca. 1890
Rigi
17.10.1984
Rigi
vor 10.08.1956
Rigi
07.03.1982
Rigi
1890-1905
Rigi
01.02.1905
Rigi
21.10.1951
Rigi
19.10.1933
Rigi
07.10.1970
Rigi
29.08.1992
Rigi
09.01.1944
Rigi
30.10.1963
Rigi
1988